Run-of-River Project

Seti Khola Small Hydropower Project

📍 Parbat, Gandaki Province, Nepal

📅 Commissioned: 2023

The Seti Khola Small Hydropower Project represents a significant milestone in sustainable energy development in Nepal. Located in Parbat district of Gandaki Province, this 3.5 MW run-of-river facility demonstrates our commitment to clean energy production while respecting environmental constraints. The project was developed with cutting-edge technology and operates with minimal environmental impact, serving as a model for future hydropower developments in the region.

🌊

Project Impact

3.5 MW
Capacity
🏠
65,000+
Households Powered
🌍
120,000 t/year
Annual CO₂ Reduction
👥
120+
Jobs Created

Technical Specifications

Installed Capacity
3.5 MW
Annual Generation
18.2 GWh
Gross Head
88.23 m
Design Discharge
6.5 m³/s
Turbine Type
Pelton Turbine (2x1.75MW)
Generator
Synchronous, 3-phase, 50 Hz
Penstock Length
1,650 m (1.2m diameter)
Land Area
15 hectares
Construction Duration
3 years
Expected Lifespan
50+ years
Environmental License
Approved

Project Highlights

Run-of-river design minimizes environmental impact and dam construction

High-efficiency Pelton turbine technology for optimal performance

Advanced SCADA monitoring and automated control systems

Real-time data collection and remote operation capability

Exceeds international environmental and safety standards

Local community employment: 120+ direct jobs during operation

24/7 professional maintenance and monitoring team

Grid-connected with automatic load balancing capabilities

🌍

Environmental Sustainability

Our run-of-river design ensures minimal environmental disruption. We maintain natural water flow to preserve aquatic ecosystems and river habitats. The project includes environmental monitoring systems and regular compliance audits.

🤝

Community Development

We invested NPR 1.5 crore in local community development. This includes education scholarships, healthcare facilities, and infrastructure improvements benefiting over 50,000 community members.

⚙️

Technical Excellence

Featuring state-of-the-art Pelton turbines and advanced control systems, our facility operates at 92% efficiency. Real-time monitoring ensures optimal performance and predictive maintenance.

💰

Economic Impact

The project generates approximately USD 3.2 million in annual revenue, supporting local infrastructure development and creating sustainable employment opportunities for the region.

Interested in Learning More?

Get detailed reports, schedules, and investment opportunities for the Seti Khola project

PPHKCL - Sustainable Hydropower in Nepal | Clean Energy Solutions